SYSTEMKAN-therm

PP Green
Assembly

Range of diameters 20-200 mm

Application

image
image
image

Connecting the system elements is performed by means of socket welding (thermal polyfusion) by means of electric welders. This welding method creates uniform connections and guarantees exceptional tightness and mechanic durability of the installation.

image

The selected pipe should be cut perpendicularly to the axis to the required length by means of plastic pipe cutters. It is not allowed to use other tools or cutters which are faulty (blunt or chipped).

image

The selected pipe should be cut perpendicularly to the axis to the required length by means of plastic pipe cutters. It is not allowed to use other tools or cutters which are faulty (blunt or chipped).

image
  1. Stripping the external part of the pipe to the size of the opening of the fitting, for example
  2. Cleaning the surface of stripped pipes with alcohol
image

3. Marking the insertion depth

4. Insert the pipe into the connector

image

5. Programming the welding machine with the laser scanner (the welding machine adjusts parameters automatically)

6. Starting the welding process – the pipe must not be rotated, bent or pulled during the process.

Need help, want to learn more? Contact us!

Select all consents.

The provision of personal data is voluntary, although necessary for the proper operation of your account and all the functionalities associated with it. Information about the user’s rights, including the right to access the content of data, rectification, erasure, restriction of processing, data portability, object, withdraw consent at any time without affecting the lawfulness of the processing and to lodge a complaint with the supervisory authority for data protection is further specified in: